Reusing Jobs in One Projection in a New Job with a Different Projection

Let’s assume that we have an .RW5 (Raw File) for a job in one projection (a custom projection) and we want to reuse ‘SOME’ of the coordinates and GPS shots in this job, in a completely NEW job with an alternate projection.

Thesis: I have hundreds of control points and boundary shots for a job that were taken in a custom LDP. Now I want to work on an adjoining site, but in a new projection (or perhaps a standard State Plane Projection.)

If we assign the previous file as the control file of new job with a completely different projection, then we can import the RAW GPS positions to set a base, and we can use the raw data as the GPS coordinates for a localization.

Continue Reading > survce_reusingcoordintesbetweendifferentjobswithdifferentprojections_reva

Leave a comment

Filed under Uncategorized

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s